Click Fraud Protection
private utility locating service icon

Concrete Scanning in Washington, DC

GPR scanning for rebar, post-tension cable, conduit and voids before coring or saw cutting, across Washington, DC, Arlington, Alexandria, Bethesda and Silver Spring.

Understand What's Underneath logo trademark for Trinity Subsurface.

Concrete scanning in Washington, DC

Trinity Subsurface scans concrete slabs, walls, decks and columns with ground penetrating radar before you core, saw cut or anchor. Technicians locate rebar, post-tension cable, electrical conduit and voids, mark them directly on the surface, and leave a field sketch so the cutting crew knows exactly where it is safe to drill. GPR uses no radiation, so hospitals, labs, offices and classrooms can stay occupied while we work.

We cover the District of Columbia, Northern Virginia and Montgomery and Prince George's counties in Maryland, including federal and institutional buildings. Call (855) 387-4648 to schedule.

Equipment

Recent DC-area concrete scanning projects

Whole Foods Market, H Street SE, Washington

Scanned the ceiling slab beneath a parking garage to map post-tension cables and other embedded features.

Federal Energy Regulatory Commission, Washington

Cleared seven coring locations 10 to 12 feet overhead, scanned from a lift.

Met Square, Washington

Located epoxy-coated rebar in an existing slab and waterproofing so new anchors could be offset around it.

Mazza Galleria, Washington

Scanned three wall locations and a slab over the parking garage, from both sides, before ductwork penetrations.

Multifamily building, Bethesda

About 80 scan locations across 10 floors to designate post-tension cables before 4-inch anchor bolts were installed.

Washington, DC concrete scanning FAQs

Is GPR a safe alternative to concrete X-ray?

Yes. GPR uses low-power radio waves instead of radiation, so nobody has to clear the floor and the work can happen during normal hours. Results are marked on the surface the same day.

Can you find post-tension cable?

Yes. Post-tension tendons, rebar and conduit all show up on GPR. On post-tensioned decks we mark tendons and leave clear zones for coring or anchoring.

How soon can you get to a DC site?

Most requests are on site within three business days, often sooner. Call (855) 387-4648 and scheduling will confirm what is possible, including any building access or escort requirements.

Can you scan and core in one visit?

Yes. Trinity Subsurface also provides concrete core drilling, so one mobilization can cover both. See our concrete scanning service for more detail.